Position Your Land Assets at the Core of the AI Revolution.
Unprecedented demand for Cloud and AI infrastructure means your large-scale acreage is more valuable than ever. Green NRG Consulting secures premium, long-term infrastructure leases for institutional data centers across the United States.
An ideal data center location relies on the following three core pillars of critical infrastructure. While all three are optimal, 2 out of 3 is always worth a comprehensive evaluation for development feasibility.
Water Availability
Significant municipal water access, water rights, or close proximity to natural water sources needed for complex infrastructure cooling systems.
High-Speed Fiber Connectivity
Deep proximity to existing fiber backbone infrastructure, transcontinental fiber routes, or established metropolitan tech corridors.
Massive Power Supply
Immediate access to high-voltage grid power transmission lines, local substations, or close proximity to a natural gas pipeline with available capacity.
Mega-Scale Sites
Preferred Parcel Size
We are actively seeking land footprints starting at a minimum of 20 acres, with a high preference for 100 to 500+ acres. Large campus and mega-campus opportunities up to 3,000 - 5,000 acres are highly desired.
Geographic Scope
Open to almost any state in the U.S., with rapid-deployment capabilities in top-tier markets including Texas, Virginia, Iowa, Georgia, and Ohio.
More Than a Lease. A Development Partnership.
If a landowner wants to co-invest alongside our development team in the initial feasibility studies, they can receive a direct equity stake in the project. Participate in the ultimate infrastructure upside, don't just collect rent.
Participate in the ultimate infrastructure upside